Division 07 – Thermal and Moisture Protection
OPL Design No. CEJ 264P
07 84 00 Fire stopping
07 84 53 Building Perimeter Fire stopping
Page 2 of 4
Date Revised: June 20, 2014
©Intertek
Project No: 100141291SAT-007
formed in the concrete, to house the
architectural cover plate. The blockout
width may also vary without restriction.
2.  CURTAIN
WALL
ASSEMBLY:
The
curtain wall assembly shall incorporate
the following construction features:
A. Mounting Attachment: (Not shown)
Attachment
of
the
curtain
wall
framing to the structural framing
shall be according to the curtain wall
manufacturer's instructions. When
required, the mounting attachments
to the floor slab shall be connected
to the adjacent face of the floor slab,
according
to
the
curtain
wall
manufacturer's instructions.  Max.
distance
between
mounting
attachments shall be 10 ft.
B. Steel-Stud Framing: Vertical framing
members shall be a min. 3-5/8 in. by
1-5/8 in. 18 GA steel "C" studs
secured in an 18 GA steel track top
and bottom using #6 x 1.25 in. Bugle
head SD PT screws. Vertical framing
shall not exceed a spacing of 24 in.
on center (oc).
C.  Sandwiched Wall Surface: Use a
min. 1/2 in. thick, 48 in. wide by 96
in. long, exterior grade gypsum
wallboard (ASTM C 79), cement
board,
or
fiberglass
sheathed
gypsum wallboard placed over and
secured to framing with min. 1-1/4
in. long Type S drywall screws 8 in.
oc.
D. Curtain Wall Insulation: (Optional –
Not Shown) A faced or un-faced
mineral wool or fiberglass** batt
insulation installed in each stud
cavity
in
accordance
with
manufacturer's
instructions.
(**
Listed with Intertek)
E.  Barrier Insulation: Use a nom. 24-in
wide by 4 in. thick min. 4 pcf faced
or un-faced mineral wool** batt
insulation cut to size as required.
Install barrier insulation in each stud
cavity so that min. 32 in.  of barrier
insulation is above the top surface of
the slab and a min. of 24 in.  is
below the bottom surface of the slab.
Barrier insulation length is min. 24
in.  and fitted tightly between vertical
framing members filling all studs.
Seal
all
butt
joints
of
barrier
insulation with min. 4 in.  wide
aluminum
foil
faced
tape.
The
curtain
wall
insulation
shall
completely fill the recess of the min.
3-5/8 in. by 1-5/8 in., 18 GA steel "C"
studs. (** Listed with Intertek)
F.  Interior Curtain Wall Surface: Apply
after Perimeter Cavity Protection (3)
is installed.  Use a min. 1/2 in. thick,
48 in. wide by 96 in. long, Type X
gypsum wallboard (ASTM C 36),
placed over and secured to framing
with #6 by 1-1/4 in.  long Type S
drywall screws 8 in. oc on the
periphery and 12 in. oc in the field.
Screw heads are covered with joint
compound. Joints created between
gypsum wallboard are taped and
floated
with
joint
compound.
Gypsum wallboard only required to
be continuously placed a min. 32 in.
above the top surface of the slab.
Gypsum wallboard below the slab is
optional.
G. Exterior Curtain Wall Insulation: An
Exterior Insulation Finish System
(EIFS) is composed of an expanded
polystyrene foam (EPS) insulation,
and a Exterior Curtain Wall Finish
(2H).
The
EIFS
system
is
a
monolithic
assembly
without
expansion or control joints.  The
EPS foam boards measure 24 in.
wide by 48 in. long by 4 in. thick with
a nominal density of 1 pcf. The EPS
foam is attached to the sandwiched
wall
surface
using
mechanical
fasteners
or
an
adhesive
in
accordance
with
manufacturer's
recommendations. Install the EPS
boards in a running bond (brick-like)
pattern
and
staggered
over
sandwiched wall surface (2C) joints.